Significant Projects
Over the Years…
• Lost Pine Nature Park Artificial Wetlands Creation: Bastrop, Texas
• Lower Colorado River Authority (LCRA) Pest Management Plan: Project Manager, LCRA, Travis County, Texas
• Illegal Dam Installation Case: Water quantity and environmental quality, Travis County and City of Austin Lawsuit, Bullick Hollow, Austin, Texas.
• Nonpoint Source Pollution Control Manual Technical Revisions for Temp. Erosion Controls, Water Quality Best Management Practices and Dredge and Fill: LCRA, Austin, Texas
• Environmental Protection Agency Section 319 Grant for Innovative Stormwater BMP Analysis ($750,000): Austin, Texas
• Texas Water Development Board Grant for Wetland/Aquatic Ecosystem Analysis Grant ($250,000): Austin, Texas
• Recreation Area Planning, Lower Colorado River Authority: Gloster Bend, Shaefer Bend, Turkey, Cedar Point, The Narrows, Smithville Park, Columbus City Park, McGregor Park, Windy Point, Mansfield Dam
• US281 / Loop 1604 EIS Evaluation: San Antonio, Texas
• US 290/ SH 71 EIS, Biological Assessment and Water Quality treatment Evaluations: Austin, Texas
• US 290/ SH 71 Noise Analysis: Austin, Texas
• SH 45 EIS and Traffic Analysis: Austin, Texas
• Loop 1604/US 281 EIS and Trans Eval.: San Antonio, Texas
• In-stream Gravel Mining Research and EIS Eval.: Osa Penisula, Costa Rica
• The Avery Tract Flood Plain Investigation: (120,000 cfs) Austin, Texas
• Austin’s Colony, Wastewater Treatment and Res Subd.: including drainage and utility improvements, Austin, Texas
• Dry Creek Culvert Modeling: (80,000 CFS) Austin Texas, (Westlake)
• Dry Creek Culvert Modeling: (100,000 cfs–the other Dry Creek): Austin, Texas, (Travis County)
• Dry Creek Wastewater Interceptor and Lift Station: (48 inch), Austin, Texas
• Tres Palacios Landfill: Palacios, Texas
• Riverforest, Offsite Water Main: New Braunfels, Texas
• Cottonwood Shores Road Rehabilitation: Cottonwood Shores, Texas
• Henly Ranch Road Rehabilitation: Henly, Texas
• Blue Hole RV Park: Park Planning, Wimberly, Texas
• Volente Peak Enviro. Site Assessment: Jonestown, Texas
• Huston Tillotson College, Master Planning: Austin, Texas
• Kinney Mues: 16 units In-fill with Underground Sand Filtration, Austin, Texas
• Northshore Marina: 308 slips, Lake Travis, sitework, On-site Wastewater treatment, stormwater quality treatment , Texas
• Sandy Creek Marina Development: 115 slips, parking stormwater, utilities, On-site Wastewater treatment, stormwater quality treatment, Lake Travis, Texas
• Jones Harbor Marina Development: 52 slips, 10 condos, parking stormwater, utilities, On-site Wastewater treatment, stormwater quality treatment, Lake Travis, Texas
• Northlake Hills Marina Development: 25 slips, 25 lots
• Northshore Res. Subd: Jonestown, Texas
• Northlake Hills Section 5 Res. Subd.: Jonestown, Texas
• Rudy’s BBQ, Parking and Bingo Parlor Improvements: Round Rock Texas
• Stoney Ridge Res. Subd.: (150 lots), Infrastructure and wetlands water quality treatment, Austin, Texas
• Springdale Commons: 24 residence urban densification, sitework, stormwater quality treatment, Austin, Texas
• Fairways of Blackhawk, Res. Subd.:: Drainage and utility improvements, Pflugerville, Texas
• Meadows of Blackhawk, Res. Subd.:: Drainage and utility improvements, Pflugerville, Texas
• Riverforest, Res. Subd.:: Drainage and utility improvements, New Braunfels, Texas
• Oakmont Crossing Drainage Improvements: Round Rock, Texas
• Fern Bluff Drainage Improvements: Round Rock, Texas
• Stoneybrook, Res. Subd.:: (150 lots) Drainage, utilities, Pflugerville, Texas
• Lake Creek, Res. Subd.: (70 lots) Drainage, utilities, Round Rock, Texas
• Maconda Park Drainage Improvements: Austin, Texas
• Block House Creek Res. Subd.: (250 lots) Drainage, utilities, stormwater quality treatment, Leander, Texas
• Texas Commerce Bank Northcross: Sitework, drainage, utilities, stormwater quality treatment, Austin, Texas
• Meadows, Hillside, and The Woods of Brushy Creek, Res. Subd.: (200 lots total) Drainage, utilities, Round Rock, Texas
• Shepherd Mountain Plaza Office Condominiums: (120,000 sf) Sitework, drainage, utilities, stormwater quality treatment, Austin, Texas
• Shepherd Mountain Plaza Office Complex: (160,000 sf) Sitework, drainage, utilities, stormwater quality treatment, Austin, Texas
• Shepherd Mountain, Res. Subd: (40 lots) Drainage and utility improvements, stormwater quality treatment, Austin, Texas
• Exxon Service Station: MLK and Guadalupe, sitework, drainage, utilities, Austin, Texas
• Exxon Service Station: William Cannon and S. First, sitework, drainage, utilities, stormwater quality treatment, Austin, Texas
• Dessau Industrial Park Master Plan: (70 acres) Austin, Texas
• Grandview Hills Master Plan: (Drainage and 36 inch water main) Austin, Texas
• Parmer Center Master Plan and Zoning: (120 acres) Austin, Texas
• North Central Estates: Regional stormwater, Austin, Texas
• Children’s Courtyard: Sitework, drainage, water quality treatment, Austin, Texas
• USA Mini-Storage: Sitework, drainage, utilities, stormwater quality treatment, Austin, Texas
• Lakepointe Section IV: (100 lots) Drainage, utility improvements, stormwater quality treatment, Austin, Texas
• HEB 21: Water Quality Plan, Austin, Texas
• Redroof Inn: IH35, Sitework, drainage, utilities, stormwater quality treatment, Austin, Texas
• Covert Ford Dealership: Sitework, drainage, utilities, Texas 183, Austin, Texas
• Days Inn: Sitework, drainage, utilities, stormwater quality treatment, Austin, Texas